Cities & counties › Arizona
Glendale, AZ
3 permits
Quick reference
623-930-2800623-930-4400623-915-3263Gathered from the steps on this page · Sep 22, 2026
Recent changes
- Permit application process · No Work C of O2h ago
- Permit application process · Certificate of Occupancy2h ago
- Permit application process · Building Permit2h ago
- Registration process · City-wide · Glendale2h ago
- Pre-approval process · City-wide · Glendale2h ago
- Plan review process · City-wide · Glendale2h ago
- Inspection process · City-wide · Glendale2h ago
- Design process · City-wide · Glendale2h ago
- Close-out process · City-wide · Glendale2h ago
By process
Look up one process on its own. The designer, the utility call, the inspections, across every permit in Glendale.
City-wide
Close-out process · City-wide
Final approval or certificate, permit expiration and extensions, revisions and change of scope, obtaining records.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Confirm fire/life safety inspection is current
AI draft · not checkedSource
As part of the license approval process, the Fire Department verifies the business location has a current (within 365 days) passing fire/life safety inspection conducted by the City of Glendale Fire Department.
Contact (623) 930-4400
Verify Certificate of Occupancy and closed building permits
AI draft · not checkedSource
Along with the Building Safety Division, the Fire Department will verify if the business location has a Certificate of Occupancy and if building permits have been closed.
Request Certificate of Occupancy after passing inspections
AI draft · not checkedSource
When you have passed all of your inspections, submit your request for the Certificate of Occupancy by sending an email to COORequest@glendaleaz.com and providing the Project Address and Building Permit #.
Updated Sep 22, 2026
Pulled this permit recently?
Design process · City-wide
What must be submitted and who may prepare it: drawings, load calculations, engineered stamps, site plan.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Prepare construction drawings and calculations
AI draft · not checkedSource
The applicant must provide enough information to describe the project fully and clearly, including construction drawings and additional calculations and/or specs.
Updated Sep 22, 2026
Pulled this permit recently?
Inspection process · City-wide
Required inspections in sequence, how to schedule, notice period and windows, re-inspection fees, what the inspector checks.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Schedule inspections by phone
AI draft · not checkedSource
Dial 623-915-3263 from a touch-tone phone. Press 1 to schedule an inspection. Enter the numeric portion of your permit number followed by the pound key (#). Enter the three-digit inspection code you wish to schedule. Verify the correct inspection type was spoken.
Contact 623-915-3263
Choose inspection date
AI draft · not checkedSource
Press 1 to schedule an inspection for the next business day (only if calling prior to 4:00 a.m.) or listen to the recorded message for further options to schedule a different day. Verify the correct inspection day is spoken.
Obtain confirmation number or schedule additional inspections
AI draft · not checkedSource
Press 1 to hear your confirmation number if this is the only inspection for the call, Press 2 to schedule another inspection on the same permit number, or Press 3 to schedule another inspection on a different permit number.
Reference inspection codes list
AI draft · not checkedSource
Use the published three-digit inspection codes for Building, Mechanical/Plumbing, Electrical, and Certificate of Occupancy inspections (for example 699 Final Inspection/Certificate of Occupancy, 688 Solar Panel, 199 Final/Structural).
Updated Sep 22, 2026
Pulled this permit recently?
Plan review process · City-wide
Whether review is required, typical turnaround, the corrections and resubmittal loop, expedited options.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Drawings reviewed for zoning and building code compliance
AI draft · not checkedSource
Your drawings will be reviewed to check that they comply with the Zoning Ordinance and Building Codes. You may be asked to make corrections or provide additional information.
Review permit fee based on project size
AI draft · not checkedSource
The fee for a building permit depends on the type and size of your project. Usually the fee will be based on the square footage of the construction area.
Receive approved plan set
AI draft · not checkedSource
When the drawings are approved and the building permit is issued, you will be given one set of approved plans to keep on the job site.
Updated Sep 22, 2026
Pulled this permit recently?
Pre-approval process · City-wide
Sign-offs required before application: zoning, HOA, historic, flood zone, fire marshal, health department.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Verify zoning before applying for a business license
AI draft · not checkedSource
Contact the Development Services Department, Planning & Zoning Division to verify the business location is zoned for the intended business activity before applying for a Glendale Business License.
Contact (623) 930-2800
Confirm if a Conditional Use Permit is needed for a home-based business
AI draft · not checkedSource
A Home Occupation conducted from a principal residence in a residential zoning district requires a Business License and may require a Conditional Use Permit. Review the Home-Based Business Questionnaire for details.
Contact (623) 930-2800
Confirm whether improvements require a building permit
AI draft · not checkedSource
Certain improvements may require a building permit. Contact the Building Safety Division to confirm if your improvements require a building permit.
Contact (623) 930-2800
Updated Sep 22, 2026
Pulled this permit recently?
Registration process · City-wide
Standing the jurisdiction requires before it issues anything: business license, state license on file, insurance and bond certificates, portal account.
AI draftSteps marked AI draft were written by AI from Glendale's own website and have not been checked by a contractor yet. Use the source link to check them, and fix anything that is off.
Obtain a Glendale Business License if operating a business location
AI draft · not checkedSource
A Glendale Business License is required for any person or business with a permanent physical business location in Glendale city limits, including at the Glendale Regional Airport. A separate license is needed for each separate location except commercial rentals. P.O. Box or PMB addresses are not accepted.
Fee $25 initial license fee; $25 annual renewal fee
Updated Sep 22, 2026
Pulled this permit recently?
Permits in Glendale
Building Permit
OpenResidential & commercial · 7 of 8 processes written · last edit Sep 22, 2026
Fee $25 initial license fee; $25 annual renewal feePhone 623-930-2800
Certificate of Occupancy
OpenResidential & commercial · 7 of 8 processes written · last edit Sep 22, 2026
Fee $25 initial license fee; $25 annual renewal feePhone 623-915-3263
No Work C of O
OpenResidential & commercial · 7 of 8 processes written · last edit Sep 22, 2026
Fee $25 initial license fee; $25 annual renewal feePhone 623-915-3263
Written by contractors, not by the City of Glendale. Permitpedia is not affiliated with or endorsed by any government agency. Confirm fees and requirements with the jurisdiction before you file.