Permitpedia Permitpedia
Building Permit
Glendale, AZ · City facts
Steps
Registration process
1.
Obtain a Glendale Business License if operating a business location (AI draft, not checked): A Glendale Business License is required for any person or business with a permanent physical business location in Glendale city limits, including at the Glendale Regional Airport. A separate license is needed for each separate location except commercial rentals. P.O. Box or PMB addresses are not accepted.
Fee: $25 initial license fee; $25 annual renewal fee
Pre-approval process
2.
Verify zoning before applying for a business license (AI draft, not checked): Contact the Development Services Department, Planning & Zoning Division to verify the business location is zoned for the intended business activity before applying for a Glendale Business License.
Contact: (623) 930-2800
3.
Confirm if a Conditional Use Permit is needed for a home-based business (AI draft, not checked): A Home Occupation conducted from a principal residence in a residential zoning district requires a Business License and may require a Conditional Use Permit. Review the Home-Based Business Questionnaire for details.
Contact: (623) 930-2800
4.
Confirm whether improvements require a building permit (AI draft, not checked): Certain improvements may require a building permit. Contact the Building Safety Division to confirm if your improvements require a building permit.
Contact: (623) 930-2800
Design process
5.
Prepare construction drawings and calculations (AI draft, not checked): The applicant must provide enough information to describe the project fully and clearly, including construction drawings and additional calculations and/or specs.
Permit application process
6.
Determine who may apply (AI draft, not checked): The homeowner, architect or a licensed contractor may apply to the City of Glendale for a building permit.
7.
Use fillable permit application form (AI draft, not checked): Use the fillable permit application form for your submittal.
8.
Submit plans electronically by project type (AI draft, not checked): Plans are submitted via email for electronic review. Submit through the Electronic Plan Review section by the project type. Include a completed permit application form, construction drawings, and additional calculations and/or specs, combined into a single PDF.
9.
Email completed application and documents to permits (AI draft, not checked): Once ready to submit an application and construction documents (if needed), send an email to permits@glendaleaz.com and attach all documents. A Development Services Department representative will contact you regarding inspection scheduling procedure.
Contact: (623) 930-2800
Plan review process
10.
Drawings reviewed for zoning and building code compliance (AI draft, not checked): Your drawings will be reviewed to check that they comply with the Zoning Ordinance and Building Codes. You may be asked to make corrections or provide additional information.
11.
Review permit fee based on project size (AI draft, not checked): The fee for a building permit depends on the type and size of your project. Usually the fee will be based on the square footage of the construction area.
12.
Receive approved plan set (AI draft, not checked): When the drawings are approved and the building permit is issued, you will be given one set of approved plans to keep on the job site.
Inspection process
13.
Schedule inspections by phone (AI draft, not checked): Dial 623-915-3263 from a touch-tone phone. Press 1 to schedule an inspection. Enter the numeric portion of your permit number followed by the pound key (#). Enter the three-digit inspection code you wish to schedule. Verify the correct inspection type was spoken.
Contact: 623-915-3263
14.
Choose inspection date (AI draft, not checked): Press 1 to schedule an inspection for the next business day (only if calling prior to 4:00 a.m.) or listen to the recorded message for further options to schedule a different day. Verify the correct inspection day is spoken.
15.
Obtain confirmation number or schedule additional inspections (AI draft, not checked): Press 1 to hear your confirmation number if this is the only inspection for the call, Press 2 to schedule another inspection on the same permit number, or Press 3 to schedule another inspection on a different permit number.
16.
Reference inspection codes list (AI draft, not checked): Use the published three-digit inspection codes for Building, Mechanical/Plumbing, Electrical, and Certificate of Occupancy inspections (for example 699 Final Inspection/Certificate of Occupancy, 688 Solar Panel, 199 Final/Structural).
Close-out process
17.
Confirm fire/life safety inspection is current (AI draft, not checked): As part of the license approval process, the Fire Department verifies the business location has a current (within 365 days) passing fire/life safety inspection conducted by the City of Glendale Fire Department.
Contact: (623) 930-4400
18.
Verify Certificate of Occupancy and closed building permits (AI draft, not checked): Along with the Building Safety Division, the Fire Department will verify if the business location has a Certificate of Occupancy and if building permits have been closed.
19.
Request Certificate of Occupancy after passing inspections (AI draft, not checked): When you have passed all of your inspections, submit your request for the Certificate of Occupancy by sending an email to COORequest@glendaleaz.com and providing the Project Address and Building Permit #.
PermitpediaUpdated Sep 22, 2026