HVAC · playbook

AC / heat pump change-out

Like-for-like split system replacement. · updated Sep 17, 2026

1
Before
Confirm tonnage, efficiency, refrigerant, and electrical
Manual J / S may be required if size changes.
2
Permit
Pull the mechanical permit (plus electrical if the circuit changes)
3
Before
Check utility rebate programs and pre-approval
4
Work
Set the unit, line set, drain, disconnect, and controls
5
Inspection
Final inspection
6
Closeout
Submit rebate paperwork and register the warranty