Panel / service upgrade
Residential main panel or service change-out, typically 100A → 200A. · updated Sep 17, 2026
1
Before
Site visit: confirm service size, meter location, and utility
Note existing amperage, overhead vs underground, meter/panel combo vs separate, and which utility serves the address.
2
Load calculation
NEC 220 load calc for the new service size. Most cities want it with the application.
3
Check utility requirements
Meter socket spec, clearances, whether the utility needs a work order or an inspection release before reconnect.
4
Permit
Pull the permit
Apply on the city portal or at the counter with the load calc and a simple one-line or site sketch if required.
5
Schedule the utility disconnect / reconnect
Lead times vary from same-day to two weeks. Book it as soon as the permit is issued.
6
Before
Order the panel, meter socket, and grounding materials
7
Work
Do the work: disconnect, replace panel, bond and ground, label circuits
8
Inspection
Call for the electrical inspection
Most cities release the meter to the utility only after the inspection passes.
9
Closeout
Utility reconnect and meter set
10
Close out the permit and file the paperwork
Save the inspection card / final approval with the job file.