Permitpedia
PlaybooksElectrical
Electrical · playbook

EV charger (Level 2) install

Dedicated 240V circuit for a wall charger, residential. · updated Sep 17, 2026

1
Before
Confirm panel capacity and space
Load calc if the panel is near capacity; consider a load-management device if a service upgrade is the alternative.
2
Confirm charger model and amperage
Hardwired vs plug-in (NEMA 14-50) changes GFCI and receptacle requirements.
3
Permit
Pull the electrical permit
Many cities have an over-the-counter or online express permit for EV chargers.
4
Before
Check for utility EV rebates or rate programs
Some utilities require pre-approval before install to qualify.
5
Work
Run the circuit and mount the charger
6
Inspection
Final inspection
7
Closeout
Submit rebate paperwork with the passed inspection

Looking for a specific city? Find the permits that apply.